Beam test of a full-length prototype of the BESIII drift chamber with the readout electronics | |
Qin ZH(秦中华)![]() ![]() ![]() ![]() ![]() ![]() ![]() | |
刊名 | NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT
![]() |
2007 | |
卷号 | 571期号:3页码:612-621 |
关键词 | BESIII drift chambers prototype readout electronics resolution beam tests threshold |
通讯作者 | CAS, Inst High Energy Phys, Beijing 100049, Peoples R China ; Chinese Acad Sci, Grad Sch, Beijing 100049, Peoples R China ; Hunan Univ, Microelectron Lab, Dept Phys, Changsha 410082, Peoples R China |
英文摘要 | A full-length prototype of the BESIII drift chamber together with its readout electronics was built and a beam test was performed. Two different methods, namely "single-threshold method" and "double-threshold method" for timing measurement, were studied. Test results show that the BESIII drift chamber and its readout electronics can reach their design specifications. The "double-threshold method" results in a better timing accuracy and noise suppression capabilities as compared with the "single-threshold method". (c) 2006 Elsevier B.V. All rights reserved. |
学科主题 | Instruments & Instrumentation; Nuclear Science & Technology; Physics; Spectroscopy |
类目[WOS] | Instruments & Instrumentation ; Nuclear Science & Technology ; Physics, Particles & Fields ; Spectroscopy |
研究领域[WOS] | Instruments & Instrumentation ; Nuclear Science & Technology ; Physics ; Spectroscopy |
原文出处 | SCI |
语种 | 英语 |
WOS记录号 | WOS:000244576000009 |
内容类型 | 期刊论文 |
源URL | [http://ir.ihep.ac.cn/handle/311005/238105] ![]() |
专题 | 高能物理研究所_实验物理中心 高能物理研究所_加速器中心 |
作者单位 | 中国科学院高能物理研究所 |
推荐引用方式 GB/T 7714 | Qin ZH,Chen YB,Sheng HY,et al. Beam test of a full-length prototype of the BESIII drift chamber with the readout electronics[J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,2007,571(3):612-621. |
APA | 秦中华.,陈元柏.,盛华义.,伍灵慧.,刘建北.,...&Li, J.(2007).Beam test of a full-length prototype of the BESIII drift chamber with the readout electronics.NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,571(3),612-621. |
MLA | 秦中华,et al."Beam test of a full-length prototype of the BESIII drift chamber with the readout electronics".NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT 571.3(2007):612-621. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论