Construction of the BEPC II RF system
Wang GW(王光伟); Sha P(沙鹏); Pan WM(潘卫民); Sun Y(孙毅); Li ZQ(李中泉); Liu R(刘熔); Huang TM(黄彤明); Ceng RH(曾日华); Zhao GY(赵光远); Huang H(黄泓)
刊名CHINESE PHYSICS C
2008
卷号32期号:1页码:#REF!
关键词superconducting cavity klystron LLRF frequency feedback
其他题名BEPCII 高频系统的建造
通讯作者Wang, GW (reprint author), CAS, Inst High Energy Phys, Beijing 100049, Peoples R China.
英文摘要The RF system for the Beijing Electron Positron Collider Upgrade (BEPC II) Project had been working since Nov, 2006. It consists of 3 subsystems including the superconducting cavity, the klystron and the low level RF system. Compared with the former RF system, the operating frequency has been changed from 200MHz to 499.8MHz, and the superconducting cavity has been used to replace the normal cavity. Up to now, the RF system performance is good and achieves the designed target.
学科主题Physics
类目[WOS]Physics, Nuclear ; Physics, Particles & Fields
收录类别SCI
WOS记录号WOS:000255855900055
公开日期2016-05-03
内容类型期刊论文
源URL[http://ir.ihep.ac.cn/handle/311005/226658]  
专题高能物理研究所_加速器中心
推荐引用方式
GB/T 7714
Wang GW,Sha P,Pan WM,et al. Construction of the BEPC II RF system[J]. CHINESE PHYSICS C,2008,32(1):#REF!.
APA 王光伟.,沙鹏.,潘卫民.,孙毅.,李中泉.,...&Wang, QY.(2008).Construction of the BEPC II RF system.CHINESE PHYSICS C,32(1),#REF!.
MLA 王光伟,et al."Construction of the BEPC II RF system".CHINESE PHYSICS C 32.1(2008):#REF!.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace