Petri net methodology for optimisation of heat integration and batch process scheduling | |
Jia Y(贾洋); Xiao W(肖武); Ruan XH(阮雪华); He GH(贺高红); Jia, Xiaoping | |
2015 | |
会议名称 | Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction (PRES) |
会议日期 | Augest 22-27, 2015 |
会议地点 | Kuching, MALAYSIA |
关键词 | EXCHANGER NETWORKS PLANTS SYSTEMS ENERGY MODEL TOOL |
卷号 | 45 |
页码 | 547-552 |
中文摘要 | In this work, a Petri net (PN) based methodology for incorporating heat integration in batch process scheduling was presented. With this method, heat integration and batch process scheduling can be optimised simultaneously. Scheduling model, firstly, was modified and constructed by PN. The disadvantages of timed Petri net (TPN), such as the asyntactic expression and unenforceable concurrent, were overcome availably and scheduling optimization can be achieved easily. Secondly, based on the similarity of PN and time-dependent heat cascade analysis technique (TDHCA) in carrying out discrete problem, PN for TDHCA was modelled. Using this model, the step to make sure streams distribution in temperature intervals was avoided and the calculation of heat deficiency was simplified. Finally, with the facility of multi-view integrated modelling, PN models for scheduling and heat integration problems were fused together. The problems for incorporating scheduling in batch process heat integration were simultaneously optimised by the combined model. An illustrative example was presented to demonstrate the validity and advantages of the proposed approach. |
收录类别 | EI ; CPCI(ISTP) |
产权排序 | 1 |
会议录 | Chemical Engineering Transactions |
语种 | 英语 |
ISSN号 | 1974-9791 |
ISBN号 | 978-88-95608-36-5 |
WOS记录号 | WOS:000366034200092 |
内容类型 | 会议论文 |
源URL | [http://ir.sia.cn/handle/173321/17223] |
专题 | 沈阳自动化研究所_信息服务与智能控制技术研究室 |
推荐引用方式 GB/T 7714 | Jia Y,Xiao W,Ruan XH,et al. Petri net methodology for optimisation of heat integration and batch process scheduling[C]. 见:Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction (PRES). Kuching, MALAYSIA. Augest 22-27, 2015. |